How long can I leave a pitched roof membrane exposed?

It’s one of the most common questions put to the A.Proctor Group technical team: the pitched roof underlay has been installed but the project is delayed, or the roof covering is on an extended lead time. How long can the membrane be left exposed? Sue Menmuir, Technical Advisor, explains what you need to know and […]

Eaves detailing and ventilation – 500 words

A roof eaves is the lowest area of a pitched roof and must shed all the water that the roof collects over its entire surface into the gutters.  As such, it is important to design and construct the eaves correctly, to ensure that it will remain durable and prevent water ingress into the structure. Traditionally, […]

What roof fixings are best for housebuilding in a coastal environment?

From salty sea air to strong winds, heavy rain and humidity, coastal environments bring a variety of challenges to housebuilders. Overcoming these challenges requires a combination of careful design, the right material choices and high-quality installation. One important consideration, and one that might be easy to overlook because of its small size, is the choice […]